The brief

Masons were employed to install scaffolding to facilitate the erection of a new roof level area on the rear spine area of the building.

The brief was to design, erect & strike a hoist support scaffold tied to building to top roof level together with two tonne passenger and goods hoist. This necessitated full perimeter edge protection to building and a full height system staircase together with temporary roof scaffolds and new plantroom/lift area scaffolds.

Overview

The space in which the scaffolding and hoist needed to be erected was very tight once welfare had been put in place, so the hoist was delivered prior to welfare being installed and then erected at a later date as agreed. The scaffold was erected in line with the designs provided by PSD and the hoist was installed by GB Access with ties directly into the building structure to avoid clashes with the scaffold bracing. All standards were as per design. A full height staircase was erected adjacent to the hoist and all went gone according to plan with erection completed ahead of programme.

Project

Lynton House, Tavistock Square, London

Client

Faithdean

Project duration

Six months

“We’ve worked with Masons on various jobs, one of the most recent involved full scaffolding for a building and a temporary roof. The way the team worked with us and others involved in the project shed new light on an industry that is so often considered to be rogue. Masons worked with great efficiency and professionalism; their ‘can do’ attitude meant they weren’t phased by any of the challenges involved in what wasn’t a simple job. I would confidently recommend the Masons Scaffolding team to anyone, we are already looking to working with them on the next project”

Steve Vancliff, Faithdean